Gardner Denver air compressor project at Mega Vinamilk dairy factory
Gardner Denver air compressor project at Mega Vinamilk dairy factory
Client: Vinamilk
Construction: TUIE
Location: My Phuoc 3 IP, My Phuoc District, Binh Duong
Time: 2017
Product: Supply of Garner Denver Oil Flooded air compressor system with Inverter control 1050 Hp
Total capacity: 1050 Hp
VS-250 x 2 units
ESN – 250 x 1 unit
Some pictures of the project: